Background

Community Day Secondary Schools (CDSS), which account for more than 60% of all public secondary schools in Malawi, were established by renovating adult education facilities built by communities due to the rapid increase in the number of students, and the lack of basic facilities. The situation was making it difficult to provide a minimum level of secondary education. In addition, many community secondary schools (CSS) is also lack of facilities and equipment, which was a major impediment to improve secondary education in Malawi. Therefore, grant aid was requested for 12 sites of secondary education facilities in five educational districts across the country, with the aim of improving basic facilities and equipment in local basic schools.

Project description

This project will be implemented with the Community Development Assistance Grant. The plan has been considered for cost reduction and efficiency improvement based on standard design specifications by using local construction methods.

  • LOCATION         Malawi
  • STRUCTURE        Masonry、1 story above ground
  • BUILDING AREA       21714.60㎡
  • TOTAL FLOOR AREA    21714.60㎡
  • CONTRACTOR        S.R. Nicholas Ltd.(lot1), J&J Construction(lot2), Terrastone Ltd.(lot3), Fargo Ltd.(lot4,5)
  • COMPLETION        2017
  • DUTIES           Basic design, Detail design, Supervision